Q 66. A manufacturing shop processes sheet metal jobs, wherein each job must pass through two machines (M1 and M2, in that order). The processing time (in hours) for these jobs is:
The optimal make-span (in hours) of the shop is:
(A) 120
(B) 115
(C) 109
(D) 79
Answer: (B)
Explanation: